Transforming an NHS Clinic: Comprehensive Refurbishment at 190 Church Road, Croydon
Undertaking large-scale refurbishment projects requires precision, expertise, and a commitment to quality. At Danlea, we specialise in delivering bespoke construction and office refurbishment services tailored to meet the unique needs of our clients. One such project was the extensive transformation of an NHS clinic located at 190 Church Road, CR0, Croydon, which we completed over four months.
Flooring and General Redecoration
The clinic’s outdated flooring was one of the first elements we addressed. We removed the old carpets and replaced them with durable vinyl flooring throughout clinical rooms, offices, conference rooms, and corridors. The choice of vinyl not only enhanced the aesthetic appeal but also met the clinic’s hygiene standards. To complement the flooring, we undertook a comprehensive painting job, breathing new life into the interior walls with clean, fresh colours.
Upgrading Doors, Lighting, and Heating Systems
We installed new doors to improve functionality and align with the modernised look of the clinic. The lighting system was also upgraded with energy-efficient solutions, ensuring optimal illumination in all areas. Additionally, the heating systems were overhauled, improving energy efficiency and ensuring a comfortable environment for both staff and patients.
Reception and Waiting Room Transformation
The reception area underwent a significant transformation. We repurposed a former storage room into a fully equipped clinical room, maximising the space available to the clinic. The waiting room was restructured to create a more welcoming and organised layout, enhancing the patient experience.
External Renovations: Roofing and Guttering
Our team also carried out essential external works, including repairing the roof and improving the guttering system. If you’re searching for roofers near me, our expert team ensures every detail is handled with precision. These enhancements were vital to ensure the clinic’s exterior was as functional and reliable as its interior. We also installed modern external lighting, boosting safety and visibility during evening hours.
Plumbing Overhaul and Bathroom Upgrades
The bathrooms were completely refurbished to accommodate the high demands of the clinic. This involved installing 15 toilets, 20 sinks, and 40 taps, as well as two 100-litre hot water tanks to ensure consistent water supply. These updates not only modernised the facilities but also improved their functionality and water efficiency.
Tailored Office Refurbishment and Design Solutions
As one of the leading office refurbishment companies, we ensured that the clinic’s administrative areas received the same level of attention. Offices were redesigned to maximise efficiency and provide a comfortable working environment for staff. Whether it was the conference room or the consultation rooms with new carpets, every detail was meticulously planned and executed.
Delivering Quality as a Top Construction Company in London
From planning to execution, this project exemplified our dedication to delivering high-quality results. As a trusted construction company, we ensured the clinic received a comprehensive overhaul that met its operational and aesthetic needs. The project was completed within the four-month timeframe, showcasing our ability to manage complex renovations with precision.